Should I repair or replace my windows?
Repair when the issue is hardware, a balance or crank, or a single cracked pane in a sound unit. Replace when the seal has failed and fog sits between the panes, the frame is rotted or out of square, or drafts return after new weatherstripping.
How long do replacement windows last?
Vinyl lasts about 20 to 30 years, fiberglass and composite 30 to 40 or more, and wood or clad 30-plus with upkeep. The sealed glass unit usually fails before the frame, so watch for fog between panes regardless of age.
What is the difference between insert and full-frame replacement?
Insert replacement keeps your existing frame and swaps in a new unit, which is faster and less invasive. Full-frame replacement removes the frame, trim, and flashing and rebuilds the opening, which is the right method when the opening is damaged or being changed.
How disruptive is replacement day?
Most projects finish in one to two days on-site, and the crew works room by room, so the home stays livable. Larger homes with high window counts take longer.
Do I need to be home during installation?
Someone should be available at the start to confirm the plan and at the end for the walkthrough. The crew works room by room in between.
Will replacement damage my interior trim?
Insert replacement keeps your existing trim. Full-frame replacement rebuilds the opening and its trim by design. Your quote states which method applies, so there are no surprises.
How much does window replacement cost in Chicagoland?
Standard replacement windows run about $900 to $2,400 per window installed, and whole-home projects range from about $9,000 to $75,000 by home size. Final pricing depends on window count, style, material, glass package, and the condition of the openings.
Is there still a federal tax credit for windows in 2026?
No. The federal credit for qualifying windows applied only to projects installed through December 31, 2025, and ended for installs after that date. Windows installed in 2025 may still be claimed on a 2025 return using IRS Form 5695.
How long does a window project take?
Most installs take one to two days on-site. Manufacturing typically runs 4 to 10 weeks after the order is confirmed, because each window is custom-built to your openings.
Does Opal install customer-supplied windows?
No. Opal installs windows sourced through its manufacturer partners, Andersen, Kolbe, and ProVia, so the product, the installation standard, and the warranty stay under one accountable team.